Colombia vs El Salvador: Mobile landline subscriptions, gaps filled
Colombia
174.09
in 2024
El Salvador
176.52
in 2024
Colombia rank
14th
El Salvador rank
13th
Mobile landline subscriptions, gaps filled over time
- Colombia
- El Salvador
How they compare
El Salvador currently reports 176.52 against 174.09 in Colombia, a difference of 2.43.
The two have swapped places 4 times across 53 shared years of data; in 1960 it was El Salvador ahead.
Colombia ranks 14th and El Salvador ranks 13th of 212 countries.
Across the 7 decades both report, Colombia averaged higher in 1 and El Salvador in 3.
Head to head by decade
| Decade | Colombia | El Salvador | Difference | Ahead |
|---|---|---|---|---|
| 1960s | 0 | 0 | 0 | β |
| 1970s | 0 | 0 | 0 | β |
| 1980s | 0 | 0 | 0 | β |
| 1990s | 1.57 | 1.24 | 0.3269 | Colombia |
| 2000s | 45.54 | 53.82 | 8.29 | El Salvador |
| 2010s | 117.6 | 147.82 | 30.22 | El Salvador |
| 2020s | 155.51 | 175.2 | 19.69 | El Salvador |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher mobile landline subscriptions, gaps filled, Colombia or El Salvador?
- El Salvador, at 176.52 against 174.09 in Colombia as of 2024.
- What is the difference in mobile landline subscriptions, gaps filled between Colombia and El Salvador?
- 2.43, with El Salvador ahead.
- How many years of comparable data are there for Colombia and El Salvador?
- 53 years are reported by both, from 1960 to 2024.
- How do Colombia and El Salvador rank globally for mobile landline subscriptions, gaps filled?
- Colombia ranks 14th and El Salvador ranks 13th of 212 countries.
- Where does this data come from?
- Statizoid (derived), published as Mobile landline subscriptions, gaps filled. Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
Mobile landline subscriptions with 88 missing years estimated by linear interpolation between the nearest real observations. Only gaps of 4 years or fewer are filled, and never beyond the first or last actual measurement β these are filled holes, not forecasts.