Bosnia and Herzegovina vs Zimbabwe: Patent applications, nonresidents, gaps filled
Bosnia and Herzegovina
13
in 2024
Zimbabwe
13
in 2024
Bosnia and Herzegovina rank
111th
Zimbabwe rank
111th
Patent applications, nonresidents, gaps filled over time
- Bosnia and Herzegovina
- Zimbabwe
How they compare
Bosnia and Herzegovina currently reports 13 against 13 in Zimbabwe, a difference of 0.
The two have swapped places 2 times across 5 shared years of data; in 2015 it was Zimbabwe ahead.
Bosnia and Herzegovina ranks 111th and Zimbabwe ranks 111th of 157 countries.
Across the 2 decades both report, Bosnia and Herzegovina averaged higher in 1 and Zimbabwe in 1.
Head to head by decade
| Decade | Bosnia and Herzegovina | Zimbabwe | Difference | Ahead |
|---|---|---|---|---|
| 2010s | 5 | 12 | 7 | Zimbabwe |
| 2020s | 11.33 | 8.67 | 2.67 | Bosnia and Herzegovina |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher patent applications, nonresidents, gaps filled, Bosnia and Herzegovina or Zimbabwe?
- Bosnia and Herzegovina, at 13 against 13 in Zimbabwe as of 2024.
- What is the difference in patent applications, nonresidents, gaps filled between Bosnia and Herzegovina and Zimbabwe?
- 0, with Bosnia and Herzegovina ahead.
- How many years of comparable data are there for Bosnia and Herzegovina and Zimbabwe?
- 5 years are reported by both, from 2015 to 2024.
- How do Bosnia and Herzegovina and Zimbabwe rank globally for patent applications, nonresidents, gaps filled?
- Bosnia and Herzegovina ranks 111th and Zimbabwe ranks 111th of 157 countries.
- Where does this data come from?
- Statizoid (derived), published as Patent applications, nonresidents, gaps filled. Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
Patent applications, nonresidents with 301 missing years estimated by linear interpolation between the nearest real observations. Only gaps of 4 years or fewer are filled, and never beyond the first or last actual measurement — these are filled holes, not forecasts.