Israel vs Malaysia: Patent applications, nonresidents, gaps filled
Israel
6,814
in 2024
Malaysia
6,356
in 2024
Israel rank
18th
Malaysia rank
19th
Patent applications, nonresidents, gaps filled over time
- Israel
- Malaysia
How they compare
Israel currently reports 6,814 against 6,356 in Malaysia, a difference of 458.
That makes Israel's figure about 1.1 times Malaysia's.
The two have swapped places 8 times across 40 shared years of data; in 1985 it was Israel ahead.
Israel ranks 18th and Malaysia ranks 19th of 157 countries.
Across the 5 decades both report, Israel averaged higher in 3 and Malaysia in 2.
Head to head by decade
| Decade | Israel | Malaysia | Difference | Ahead |
|---|---|---|---|---|
| 1980s | 2,900 | 1,621 | 1,278 | Israel |
| 1990s | 2,686 | 3,977 | 1,291 | Malaysia |
| 2000s | 5,456 | 4,663 | 793.6 | Israel |
| 2010s | 5,533 | 5,977 | 444.1 | Malaysia |
| 2020s | 7,535 | 6,392 | 1,143 | Israel |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher patent applications, nonresidents, gaps filled, Israel or Malaysia?
- Israel, at 6,814 against 6,356 in Malaysia as of 2024.
- What is the difference in patent applications, nonresidents, gaps filled between Israel and Malaysia?
- 458, with Israel ahead.
- How many years of comparable data are there for Israel and Malaysia?
- 40 years are reported by both, from 1985 to 2024.
- How do Israel and Malaysia rank globally for patent applications, nonresidents, gaps filled?
- Israel ranks 18th and Malaysia ranks 19th of 157 countries.
- Where does this data come from?
- Statizoid (derived), published as Patent applications, nonresidents, gaps filled. Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
Patent applications, nonresidents with 301 missing years estimated by linear interpolation between the nearest real observations. Only gaps of 4 years or fewer are filled, and never beyond the first or last actual measurement — these are filled holes, not forecasts.