Telephone faults cleared by next working day (%) in Eswatini

Eswatini: Telephone faults cleared by next working day (%) was 82.0% in 2011. ▲ Rising

Latest (2011)
82.0%
Change on year
up 5.1%
World rank
17th
of 33 countries
All-time high
86.0%
in 2009
All-time low
29.6%
in 1999
Years of data
15
1993–2011

Telephone faults cleared by next working day in Eswatini, 1993–2011

204060801993200220111993: 44.8 %1994: 51.4 %1997: 52 %1998: 31.2 %1999: 29.6 %2002: 85 %2003: 82 %2004: 74 %2005: 72 %2006: 70 %2007: 74 %2008: 72 %2009: 86 %2010: 78 %2011: 82 %

Source: International Telecommunication Union, World Telecommunication Development Report and database, and World Bank estimates. Measured in %.

Analysis

The most recent figure for telephone faults cleared by next working day in Eswatini is 82.0%, measured in 2011.

Compared with earlier readings it is up 5.1% on the previous year and down 3.5% over ten years.

Over the whole period, telephone faults cleared by next working day in Eswatini peaked at 86.0% in 2009 and was at its lowest, 29.6%, in 1999.

Eswatini ranks 17th of 33 countries on this measure, in the middle of the range.

The long-run direction has been consistently rising across the 15 years of available data.

Telephone faults cleared by next working day (%) in Eswatini, year by year

Annual values for Telephone faults cleared by next working day (%) in Eswatini, 1993 to 2011.
Year % Change
1993 44.8% —
1994 51.4% +14.8%
1997 52.0% +1.2%
1998 31.2% -40.0%
1999 29.6% -5.1%
2002 85.0% +187.2%
2003 82.0% -3.5%
2004 74.0% -9.8%
2005 72.0% -2.7%
2006 70.0% -2.8%
2007 74.0% +5.7%
2008 72.0% -2.7%
2009 86.0% +19.4%
2010 78.0% -9.3%
2011 82.0% +5.1%

Eswatini compared with similar countries

  • Eswatini's 82.0% is above the median for Sub-Saharan Africa, which is 82.0%, 1.0× the median. (29 countries reporting)
  • Eswatini's 82.0% is above the median for lower middle income countries, which is 76.0%, 1.1× the median. (18 countries reporting)

Biggest year-on-year movements

Years where Telephone faults cleared by next working day (%) in Eswatini changed far more than this series normally does. A large move can be a real event or a change in how the figure was measured — the source note below says who published it.

YearChange FromTo
2002 +187.2% 29.6% 85.0%

Averages by decade

DecadeAverage LowestHighest Years
1990s 41.8% 29.6% 52.0% 5
2000s 76.9% 70.0% 86.0% 8
2010s 80.0% 78.0% 82.0% 2

Countries ranked near Eswatini

  1. 14 Mozambique 87.0% compare
  2. 15 Uganda 85.0% compare
  3. 16 Chad 82.3%
  4. 18 Senegal 78.0% compare
  5. 19 Tunisia 74.0% compare
  6. 20 Kenya 71.5% compare

See the full ranking of 34 places →

More science & technology data for Eswatini

All data for Eswatini →

Frequently asked questions

What is telephone faults cleared by next working day in Eswatini?
Telephone faults cleared by next working day in Eswatini was 82.0% in 2011, according to International Telecommunication Union, World Telecommunication Development Report and database, and World Bank estimates.
What is the highest telephone faults cleared by next working day recorded in Eswatini?
The highest recorded value was 86.0% in 2009.
What is the lowest telephone faults cleared by next working day recorded in Eswatini?
The lowest recorded value was 29.6% in 1999.
How does Eswatini rank for telephone faults cleared by next working day?
Eswatini ranks 17th out of 33 countries with data for 2011.
Is telephone faults cleared by next working day rising or falling in Eswatini?
Over the last ten years it is down 3.5%. The long-run trend across the full record is rising.
Where does this Eswatini data come from?
The figures come from International Telecommunication Union, World Telecommunication Development Report and database, and World Bank estimates, published as part of Telephone faults cleared by next working day (%). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Telephone faults cleared by next working day in Eswatini. Statizoid, drawing on International Telecommunication Union, World Telecommunication Development Report and database, and World Bank estimates. Retrieved 08 November 2026, from https://science-tech.statizoid.com/stat/telephone-faults-cleared-by-next-working-day-percent/eswatini/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://science-tech.statizoid.com/stat/telephone-faults-cleared-by-next-working-day-percent/eswatini/">Telephone faults cleared by next working day in Eswatini</a> — Statizoid

About this data

Indicator
Telephone faults cleared by next working day (%)
Unit
%
Source
International Telecommunication Union, World Telecommunication Development Report and database, and World Bank estimates
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
34 places, 417 data points, 1982–2011
Last refreshed

Telephone faults cleared by next working day are the percentage of faults in the public switched telephone network that have been corrected by the end of the next working day.